Math/Science Project: Ongoing miscellaneous deliveries involving large trucks entering and exiting the site. Ongoing steel bolting, welding and concrete placement. Continued scaffolding, framing, drywall installation, and roofing. Continued mechanical, electrical, and plumbing rough installations. Crane will be removed from the site on Monday. Please watch for and obey delineations, be cautious of construction traffic, and follow safety directions from workers directing traffic. Noise level expected to be moderate due to large equipment for these activities. The sidewalk west of the project is closed for the duration of the project. A temporary pedestrian walkway has been created in Parking Lots C and D to accommodate all pedestrian traffic through this area. (See attached GWC map [PDF] for pedestrian walkway and Construction Vehicle Routes)

General Note: For any additional questions or clarifications, please email Randy Flint at rflint@gwc.cccd.edu.