Math/Science Project: Ongoing miscellaneous deliveries involving large trucks entering and exiting the site. Ongoing steel bolting, welding and concrete placement. Crane build up in the parking lot is scheduled for Monday; the area will be closed off and delineated. Crane will be moved inside the fence for placing large HVAC equipment. Continued scaffolding, framing, drywall, and mechanical, electrical, and plumbing rough installations. Please obey delineations, be cautious of construction traffic, and follow safety directions from workers directing traffic. Noise level expected to be moderate due to large equipment for these activities. The sidewalk west of the project is closed for the duration of the project. A temporary pedestrian walkway has been created in Parking Lots C and D to accommodate all pedestrian traffic through this area. (See attached GWC map [PDF] for pedestrian walkway and Construction Vehicle Routes)

General Note: For any additional questions or clarifications, please email Randy Flint at rflint@gwc.cccd.edu.