Student Services Project: Continuing grading around the project. Placing of concrete for sidewalks at the west side of the project will take place on Wednesday, October 25 and Friday, October 27, with large equipment set up on Main Street. Flagmen will be on site; please exercise caution and follow their direction. Ongoing installation of interior windows, glass, and door mullions. Ongoing installation of the acoustical grid and overhead electrical. Ongoing installation of ceramic tile in restrooms and flooring throughout. Ongoing installation of casework and miscellaneous accessories. Ongoing testing startup of HVAC equipment. Miscellaneous deliveries will be made on the access road between Kaplan and the Amphitheater, and the road between the Native Garden and Auto Tech all the way to Cosmetology and Main Street, which may cause congestion. Please exercise caution around the construction equipment as they enter the campus, and follow directions from the flagmen. Noise levels will be moderate due to large equipment for these activities. (See attached GWC map [PDF] for Construction Vehicle Routes)

Criminal Justice Project: Interior finishing of walls and ceilings. Ongoing construction activity at Scenario Lab. Ongoing site grading, flatwork and landscaping. On Monday, the Access Road between the north of side the project and the Theater, as well as the Access Road between Kaplan and the Amphitheater, will be partially blocked off for electrical work in the manholes. Pedestrian traffic, exercise caution and mind the areas which are cordoned off. The Pull Over Lane remains closed for public parking until further notice. Pedestrians and Drivers need to follow closure signs and exercise caution as they travel around the construction site. Noise levels will be moderate due to the large equipment for these activities. The south access road between Parking Lots G and H will be closed intermittently due to construction activity- please exercise caution and drive slowly on the access road as it is narrow and difficult to see oncoming traffic. The traffic lane along the fenced Pull Over Lane in Parking Lot G will be closed periodically for truck deliveries and traffic into the Pull Over Lane area, and for construction vehicles en route to the Scenario Lab. (See attached GWC map [PDF] for areas subject to periodic closure, and Construction Vehicle Routes).

Math/Science Project: Ongoing maintenance grading and dirt export/import at the site. Ongoing backhoe trenching and backfill activity for underground utilities. Noise level expected to be moderate due to large equipment for these activities. Please be cautious of construction traffic and follow safety directions from workers directing traffic. The sidewalk west of the project is closed for the duration of the project. A temporary pedestrian walkway has been created in Parking Lots C and D to accommodate all pedestrian traffic through this area. (See attached GWC map [PDF] for pedestrian walkway and Construction Vehicle Routes).

General Note: For any additional questions or clarifications, please email Randy Flint at rflint@gwc.cccd.edu.