Student Services Project:   Continued preparation for and placing of concrete around project.  Concrete placement at the south end of the project will be on Monday, Wednesday, and Friday with trucks on Main street; please watch for the trucks and exercise caution.  Continued installation of catch basins and clean out boxes.  Ongoing installation of the acoustical grid and overhead electrical.  Ongoing installation of ceramic tile and fixtures in restrooms.  Ongoing installation of flooring, casework, and miscellaneous accessories throughout.  Miscellaneous deliveries will be made on the access road between Kaplan and the Amphitheater, and the on road between the Native Garden and Auto Tech all the way to Cosmetology and Main Street, which may cause congestion.  Please exercise caution around the construction equipment as they enter the campus, and follow directions from the flagmen.  Noise levels will be moderate due to large equipment for these activities. (See attached GWC map for Construction Vehicle Routes)

Criminal Justice Project:   Interior finishing of walls, ceilings, and floors.  Ongoing construction activity at Scenario Lab and Grinder.  Ongoing flatwork and landscaping along the Access Road between the north side of the project and the Theater, as well as the drive aisle along the east side of the project and Parking Lot H.  The South access road will be closed intermittently Tuesday through Thursday for installation of the gates at the south west side of the road; watch for closures.  Scaffolding will be disassembled and removed from the site in large trucks at the end of the week.  Concrete trucks will be entering and exiting off Edinger in Parking Lot G.  The Pull Over Lane remains closed for public parking until further notice.   Pedestrians and Drivers need to follow closure signs and exercise caution as they travel around the construction site.  Noise levels will be moderate due to the large equipment for these activities.   The south access road between Parking Lots G and H will be closed intermittently due to construction activity- please exercise caution and drive slowly on the access road as it is narrow and difficult to see oncoming traffic.  The traffic lane along the fenced Pull Over Lane in Parking Lot G will be closed periodically for truck deliveries and traffic into the Pull Over Lane area, and for construction vehicles en route to the Scenario Lab.  (See attached GWC map for areas subject to periodic closure, and Construction Vehicle Routes)

Math/Science Project:   Continued excavation for footings.  Ongoing backhoe trenching and backfill activity for underground utilities involving large equipment and concrete trucks entering and exiting the site.  Noise level expected to be moderate due to large equipment for these activities.  Please be cautious of construction traffic and follow safety directions from workers directing traffic.  The sidewalk west of the project is closed for the duration of the project.  A temporary pedestrian walkway has been created in Parking Lots C and D to accommodate all pedestrian traffic through this area.  (See attached GWC map for pedestrian walkway and Construction Vehicle Routes)

General Note:  For any additional questions or clarifications, please email Randy Flint at rflint@gwc.cccd.edu.

Please post.