Student Services Project:  Ongoing installation of exterior terra cotta.  Ongoing installation of exterior trim and lath.  Begin application of plaster scratch coat.  Installation of forms and placing of concrete at the bridge area. Excavation for installation of sleeves for irrigation; installation of catch basins.  Ongoing interior taping of drywall; begin painting on the first floor.  Ongoing placement of overhead electrical and fire sprinklers.  Miscellaneous deliveries will be made on the main construction access road, which may cause congestion.  The main construction access road is the road between the Native Garden and Auto Tech all the way to Cosmetology.   Please exercise caution around the construction equipment as they enter the campus, and follow directions from the flagmen.  Noise levels will be moderate due to large equipment for these activities. (See attached GWC map for Construction Vehicle Routes)

Criminal Justice Project:   Ongoing exterior stucco operation.  Ongoing installation of interior drywall.  Ongoing site utility connections.  Ongoing rough end of 2nd floor Mechanical, Electrical, and Plumbing installation.  Ongoing construction activity at Scenario Lab.  Asphalt will be laid on Tuesday for the pull over lane in the dirt lot adjacent to Parking Lot G and for speed bumps on the south access road.  There will be closures on the south access road and the traffic lane in Parking Lot G along the dirt lot.  Ongoing miscellaneous deliveries scheduled.  Pedestrians and Drivers need to follow closure signs and be cautious as they travel around the construction site.  Noise levels will be moderate due to the large equipment for these activities.  The dirt lot adjacent to Parking Lot G remains closed for any public parking.   Parking Lot H and Parking Lot I are open for vehicle parking; watch for deliveries. The south access road between Parking Lots G and H will be closed intermittently due to construction activity- please exercise caution and drive slowly on the access road as it is narrow and difficult to see oncoming traffic.  The traffic lane along the dirt lot in Parking Lot G will be closed periodically for truck deliveries and traffic into the dirt lot area, and for construction vehicles en route to the Scenario Lab.  (See attached GWC map for areas subject to periodic closure, and Construction Vehicle Routes)

Math/Science Project:  Ongoing pile drilling, reinforcement, and concrete placement operations consisting of large equipment, including drilling rigs.  Ongoing grading and dirt export from the site.  Noise level expected to be moderate due to large equipment for these activities.  Please be cautious of construction traffic and follow safety directions from workers directing traffic.  The sidewalk west of the project is closed for the duration of the project.  A temporary pedestrian walkway has been created in Parking Lots C and D to accommodate all pedestrian traffic through this area.  (See attached GWC map for pedestrian walkway and Construction Vehicle Routes)

General Note:  For any additional questions or clarifications, please email Randy Flint at rflint@gwc.cccd.edu.