Construction Update for Week Beginning: 2/28/22

Language Arts Complex - Measure M:
Construction activity continues this week with steel erection, metal decking installation, and intermittent deliveries. The construction fence on the north side of the project has been pushed out to allow for additional storage space and laydown of materials, while maintaining a path of travel between Gen Ed and the Bookstore and Student Services Center. Delivery trucks will continue moving through Parking lot B off of Goldenwest Street and entering campus between the Native Garden and Auto Tech. This route takes them past Cosmetology and the Student Union/Cafeteria, and down Main Street, accessing the construction site through gates near the front of the Bookstore. Exercise extra caution around trucks, minding the flagmen and avoiding these areas. Other construction traffic will continue to enter and exit off of Goldenwest Street and move through the barricaded area in Parking Lot C, accessing the construction site via the construction gate between the Math & Science bldg. and the LRC. Please mind flagmen and parking lot barricades, and avoid this area. There is no parking within the barricades. Roads and walkways within any fenced off construction area are not accessible to pedestrian traffic; please use alternate routes to get around Campus. Exercise caution around construction vehicles and areas surrounding the construction site. Noise level will be moderate for these activities. (See attached map [PDF] for work areas and construction vehicle routes)

General Note:
For any additional questions or clarifications, please email Mike Golden at mgolden7@gwc.cccd.edu for Measure M projects, and Frank Fonseca at ffonseca1@gwc.cccd.edu or Joe Dowling at jdowling@gwc.cccd.edu for Campus projects.

curve